P&D TAMPA | Brandon Gateway Medical Plaza
Construction is underway for the Brandon Gateway Medical Plaza! Breaking ground on October 24th, the client’s goal was to develop a medical office building of approximately 60,000 SF on a parcel located at the northwestern quadrant of the Brandon Parkway and Lakewood Drive. Genesis prepared a conceptual stormwater management plan and calculations for the development based on the previously prepared conceptual layout. Upon final selection of a conceptual site plan, Genesis prepared a geometrically controlled site layout on the final project survey for the proposed development in conformance with the local agency Land Development Code requirements. Genesis also provided landscape and irrigation design, permitting, and construction observation services for this project.
Read More
SPOTLIGHT STAFF ON THIS PROJECT
Kyle Thornton, P.E.
Project Manager responsible for client coordination and overseeing all site design and permitting.
Jose Maldonado, CGC
Responsible for construction inspection.
Jonathon Thornton, E.I.
Project Engineer responsible for plan production and permitting.
CEI NORTHWEST FLORIDA | 183 North (Kidd Road) SCRAP
The 7.1-mile, over $3.3-million CR 183 North (Kidd Road) SCRAP Improvement project includes roadway overlay construction from Highway 90 to the Walton County/Holmes County line. The proposed improvements include widening of the existing road from 20 feet to 24 feet, constructing sodded swales, asphalt leveling course, signage, striping, and other safety and drainage improvements. All driveways, culverts, and mitered end section will be replaced. The project began in August of 2017 and the expected completion is Summer 2018.
Read More
SPOTLIGHT STAFF ON THIS PROJECT
Doug Pritchard, Project Administrator
Leads field and office staff in providing the client with excellent CEI services.
Greg Edmonson, CEI Senior Inspector
Leads the team of inspection staff to ensure the project is constructed per the contract plans.
Mike Graham, CEI Contract Support Specialist
Ensures progress payments, contract changes, and materials are documented with accuracy.
P&D TALLAHASSEE | Connected Vehicle Testing and Integration
Under FDOT’s TSM&O Program, arterial traffic management solutions are receiving renewed focus, especially given the technology advances offered by connected vehicles (CV). FDOT is deploying a major Signal Phase and Timing (SPaT) project using CV technology at the City of Tallahassee. The FDOT and City of Tallahassee partnership will install roadside units to broadcast SPaT information 24/7 for vehicle onboard units to receive. Genesis is involved in the testing, integration, and implementation of SPaT at 22 intersections on Mahan Drive in Tallahassee and will support the advancement of Vehicle-to-Infrastructure capabilities, especially related to intersection safety applications. This project will also provide FDOT and local agency staff experience in the operation and maintenance of CV infrastructure and applications.
Read More
SPOTLIGHT STAFF ON THIS PROJECT
Tracy Forester
Project Manager responsible for integration of the devices, testing the system, implementation of the system for FDOT, and assisting with the RFP.
Lucas VanSickle
Senior Designer responsible for device locations and system testing.
Alvin Lubis
Graduate Engineer responsible for device locations and system testing.
CEI SOUTHWEST FLORIDA | I-75 Northbound On-Ramps at I-4

Genesis CEI is teaming with WSP for this initially 434-day, $17.8 million project in Hillsborough County. The project relocates and combines the two northbound on-ramps to improve traffic flow at the interchange by eliminating the short merge distances. The project will also add a fourth lane to the mainline within the project limits to provide ample distance for traffic to enter the three-lane section of I-75. Work on the project includes concrete and asphalt pavement, construction of four new bridges, eight MSE walls, an extensive amount of subsoil excavation, signing, pavement markings, and roadway lighting. The expected completion for this project is Spring 2018.
Read More

SPOTLIGHT STAFF ON THIS PROJECT
Joe Blasewitz, Project Administrator
Ensures the contract documents are being adhered, while leading the office and field staff.
Wilson Mayo, CEI Senior Inspector
Works with the team of inspection staff to report the contractor’s activities and verify construction materials.
P&D JACKSONVILLE | The Dora Block Development
Genesis is performing site planning, engineering, due diligence, and regulatory design services for the 26,600 SF infill redevelopment project in the Brooklyn area of Downtown Jacksonville. The Dora Block Development consists of the rehabilitation of the corridor between Spruce and Chelsea Streets. The existing 1950s church is a proposed adaptive reuse 5,600 SF brewery with the intent to keep its character and structure intact. On the adjacent corner, the proposed 5,000 SF restaurant preserves the urban edges while the exterior spaces promote activity on the corner and throughout the block.
SPOTLIGHT STAFF ON THIS PROJECT
Joseph Loretta, PLA
Project Manager / Site Planner
Michael Sanders, Jr., P.E.
Project Engineer
Arielle Mundy
GIS Specialist responsible for providing GIS exhibits.