I-10 Davis to Scenic Highway

> I-10 Davis to Scenic Highway

I-10 Davis to Scenic Highway

I-10 Davis to Scenic Highway

Client: FDOT District 3
Location: Escambia County, FL
Size: Length: 4 miles Construction Cost: $46.1 million
Service: Genesis CEI Services

Highlights:
Contact Staff: Tony Harvey
 

New features and improvements for this project include:

  • Widening I-10 from four to six travel lanes
  • Widening Scenic Hwy between Whisper Way and Northpointe Pkwy
  • Replacing the Scenic Hwy overpass with a new bridge
  • Decorative lighting
  • Sidewalks
  • Turn lanes
  • Bike lanes
  • Reconstructing I-10 ramps at Scenic Hwy
  • Constructing drainage improvements, including five stormwater retention ponds
  • Installing new signalization and highway lighting
  • Constructing sound barrier walls
  • Asphalt pavement milling and resurfacing
  • Earthwork construction
www.GenesisGroup.com

I-10 Davis to Scenic Highway


Escambia County, FL

Client:

FDOT District 3

Location:

Escambia County, FL

Size:

Length: 4 miles Construction Cost: $46.1 million

Service

Genesis CEI Services

Highlights:

Construction Engineering and Inspection
Utility Coordination

Contact Staff:

Tony Harvey

I-10 Davis to Scenic Highway

New features and improvements for this project include:

  • Widening I-10 from four to six travel lanes
  • Widening Scenic Hwy between Whisper Way and Northpointe Pkwy
  • Replacing the Scenic Hwy overpass with a new bridge
  • Decorative lighting
  • Sidewalks
  • Turn lanes
  • Bike lanes
  • Reconstructing I-10 ramps at Scenic Hwy
  • Constructing drainage improvements, including five stormwater retention ponds
  • Installing new signalization and highway lighting
  • Constructing sound barrier walls
  • Asphalt pavement milling and resurfacing
  • Earthwork construction