US-331 (SR 83) from US-98 (SR 30) to Choctawhatchee Bay Bridge
Walton County, FL
Client:
FDOT District 3
Location:
Walton County, FL
Size:
Construction Cost: $10.5 million
Service
Genesis CEI Services
Highlights:
Construction Engineering and Inspection
Scheduling
Utility Coordination
US-331 (SR 83) from US-98 (SR 30) to Choctawhatchee Bay Bridge

This project won the Florida Transportation Builders Association's (FTBA) 2010 Best in Construction Urban Award.
Genesis CEI worked on this extensive project along US-331, a major route to Florida's Gulf Coast, which consisted of replacing the existing two lane rural roadway with a four lane divided urban roadway with storm sewer, bike lanes, sidewalk, retention ponds, and new traffic signals. Significant environmental challenges associated with Choctawhatchee Bay were overcome on this successful project.